Error
  • The template for this display is not available. Please contact a Site administrator.

ODHIN Technical Reports and Deliverables

Documents

Order by : Name | Date | Hits [ Descendent ]

WP5 - Deliverable 5.1: RCT Protocol WP5 - Deliverable 5.1: RCT Protocol

hot!
Date added: 09/03/2012
Date modified: 04/06/2016
Filesize: 1.07 MB
Downloads: 6060

Original Protocol for the WP5 randomised controlled trial (RCT), as submitted to the European Commission in June 2012.

(related text: Deliverable 5.2 Results of the WP5 RCT, including updated methods. Available soon)

WP2: MS1 - Protocol WP2: MS1 - Protocol

hot!
Date added: 09/03/2012
Date modified: 06/05/2014
Filesize: 558.78 kB
Downloads: 4972

Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol.

WP2: MS1 - Protocol Amendment WP2: MS1 - Protocol Amendment

hot!
Date added: 09/03/2012
Date modified: 06/05/2014
Filesize: 68.06 kB
Downloads: 6460

Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol Amendment.

ODHIN First Periodic Report ODHIN First Periodic Report

hot!
Date added: 03/22/2013
Date modified: 12/15/2016
Filesize: 4.98 MB
Downloads: 6020

The first periodic technical report for ODHIN details the scientific project work undertaken in all work packages between 1st January 2011 and 30th June 2012, as well as progress towards milestones and deliverables, as laid out in the description of work.

Deliverable 3.1 - Cost-Effectiveness Model Report Deliverable 3.1 - Cost-Effectiveness Model Report

hot!
Date added: 01/20/2014
Date modified: 02/21/2014
Filesize: 663 kB
Downloads: 20502